The 48 Engineers Regiment of Ghana Armed forces on Monday began the demolition of four dilapidated blocks within the Kaiser Flats enclave which were declared unhabitable by NADMO.
The four blocks, 407, 408, 410 and 415 failed ‘structural integrity’ after an assessment revealed that the iron rods had rusted with the basement becoming very weak. This makes the continuous occupation of the flats a looming disaster, hence the demolition.
The affected occupants of the flats were evacuated by the Tema Development Company Limited with the assistance of NADMO in February this year.
Ghana | Atinkaonline.com | Edward Sebbie